BIM and Primavera Integration in Structural Project Planning: A Simulation Based Study
DOI:
https://doi.org/10.71285/icpt.v2i1.10Abstract
The integration of structural design and construction scheduling has become increasingly important in enhancing the efficiency and success of civil engineering projects. Traditionally, these two phases have been treated separately, often leading to miscommunication, delays, and cost overruns. With the development of digital tools such as Building Information Modeling (BIM) and project scheduling software like Primavera P6, there is a growing opportunity to bridge this gap through integrated workflows. This study aims to explore how modern digital tools can improve coordination between design and execution stages in civil engineering projects. Specifically, it investigates the impact of integrating BIM with construction scheduling on time management, resource utilization, and interdisciplinary coordination through a simulated practical approach. A five-story residential building was modeled using BIM software (Revit), and its construction schedule was developed using Primavera P6. These tools were integrated to create a 4D BIM model that visualizes the construction sequence and enables early detection of potential conflicts before actual implementation. The findings demonstrated that the integrated approach significantly improved project performance. It reduced the total project duration by up to 13.5%, decreased the number of design changes from 14 to only 5, and increased resource utilization efficiency from 78% to 92%. Clash detection identified 48 conflicts prior to execution, highlighting the benefits of early-stage coordination. This research concludes that integrating structural design with construction scheduling using BIM and scheduling tools enhances time management, cost control, and collaboration across disciplines. It also emphasizes the need for training and investment in digital technologies to support broader adoption in the construction industry.
References
M. Kassem, G. Salazar, and N. Dawood, “BIM in low-resource settings: Investigating the use of BIM in small and medium enterprises,” Autom. Constr. , vol. 59, pp. 106–116, 2015.
A. McKenna and J. Fischer, “Barriers to effective implementation of BIM in the UK construction industry,” Proc. Inst. Civ. Eng. - Manage. , vol. 167, no. 7, pp. 389–400, 2014.
Y. Arayici et al., “Implementing BIM in the UK construction industry: Challenges and enablers,” J. Inf. Technol. Constr. , vol. 16, pp. 132–145, 2011.
C. Eastman, P. Teicholz, R. Sacks, and K. Liston, BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 3rd ed. Wiley, 2018.
S. Azhar, “Building information modeling (BIM): Trends, benefits, risks, and challenges for firms and stakeholders,” Leadersh. Eng. Manuf. , vol. 2, no. 3, pp. 139–147, 2011
H. Song, C. Eastman, and T. Sacks, “Automated generation of 4D BIM models for simulation,” Autom. Constr. , vol. 60, pp. 158–173, 2015.
R. Eadie, M. Browne, S. McKeown, F. Heaney, and N. Hassan, “BIM implementation throughout the UK construction project lifecycle: An analysis,” Autom. Constr. , vol. 36, pp. 145–151, 2013.
A. Dainty, B. Bagilhole, and P. Powell, “Gender and construction project management – Still an unequal playing field?” Eng. Constr. Archit. Manag. , vol. 10, no. 1/2, pp. 49–60, 2003.
M. Marzouk and O. El-Razek, “Evaluating BIM adoption in Egypt’s construction industry,” J. Civ. Eng. Manag. , vol. 24, no. 4, pp. 303–312, 2018.
PMI, A Guide to the Project Management Body of Knowledge (PMBOK® Guide) , 6th ed. Newtown Square, PA, USA: Project Management Institute, 2017.
J. K. Wight and J. G. MacGregor, Reinforced Concrete: Mechanics and Design , 7th ed. Pearson, 2016.
A. K. Jain, Design of Reinforced Concrete Structures , 2nd ed. Oxford University Press, 2018.
D. Arditi and T. Gunaydin, “Building trends in foreign construction markets,” J. Constr. Eng. Manage. , vol. 124, no. 2, pp. 151–158, 1998.
X. Li, Y. Zhang, and M. Skitmore, “A comparative study of BIM diffusion in the UK and China,” Eng. Constr. Archit. Manag. , vol. 25, no. 5, pp. 628–644, 2018.
G. Lee, H. Gu, and S. Jeong, “Critical success factors for implementing BIM in South Korea,” Int. J. Constr. Educ. Res. , vol. 14, no. 1, pp. 20–34, 2018.
R. Volk, J. Stengel, and F. Schultmann, “Building Information Modeling (BIM) for existing buildings – Literature review and future needs,” Autom. Constr. , vol. 38, pp. 109–127, 2014.
H. Alreshidi, M. Mourshed, and Y. Dahlan, “Adoption of BIM in large construction projects in Saudi Arabia: Opportunities and barriers,” J. Inf. Technol. Constr. , vol. 23, pp. 1–18, 2018.
Y. Arayici et al., “Implementing BIM in the UK construction industry: Challenges and enablers,” J. Inf. Technol. Constr. , vol. 16, pp. 132–145, 2011.
A. Shapira and M. Goldenberg, “Factors affecting implementation of building information modeling (BIM): Contractors’ perspectives,” J. Manag. Eng. , vol. 29, no. 4, pp. 428–440, 2013.
Industry Report, “Digital Transformation in Construction: Software Adoption Trends,” Construction Tech Review , vol. 12, no. 3, pp. 45–59, 2022.
Public Source, “Sample Workflow Diagrams for BIM Integration,” [Online]. Available: https://www.bimexamples.org/workflow-diagrams , 2021.
M. Ahmed and S. Rahman, “Applying SWOT Analysis in Construction Project Planning,” Int. J. Proj. Manag. , vol. 40, no. 2, pp. 112–125, 2023.
T. Nguyen, “Limitations of Simulated Models in Construction Research,” J. Constr. Res. Pract. , vol. 18, no. 1, pp. 78–91, 2021.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Noor Jameel Mohammed

This work is licensed under a Creative Commons Attribution 4.0 International License.